Buying HDPE geomembrane in the UAE: what to check before you order
Two quotations for the same basin can differ by half, and both can be for something described as “1.5 mm HDPE geomembrane”. Here is what…
Technical notes
Specification, welding, thickness, cost and the practical detail of lining basins in a country where it is 45 degrees for a third of the year. Written for the people who actually buy and install this material.

Two quotations for the same basin can differ by half, and both can be for something described as “1.5 mm HDPE geomembrane”. Here is what…

Three polymers, three very different personalities. Picking between them is not about which is best — it is about what the ground under your basin is…

Sheet arrives from the mill consistent and certified. Seams are made on site, in the heat, by people. That is where lining projects succeed or fail.

The sheet is the easy part. Everything that decides whether a pond holds water happens before the first roll comes off the truck and after the last seam…

Seepage from an open channel is invisible. There is no leak to point at — just water that arrives at the far end in smaller quantity than it left.

A landfill liner is not a sheet. It is a sequence of layers, each doing one job, and the interfaces between them decide whether the slope stands up.

A farm reservoir on sand loses water two ways at once. Telling the two apart is the first step, because only one of them is fixed by lining.

It is a fabric that costs a fraction of the membrane above it, and leaving it out is the most expensive saving on most lining projects.

American specifications say mil. Gulf specifications say millimetres. Chinese mills sometimes say microns. They are the same measurement and mixing them…

Nobody can publish a meaningful rate for geomembrane, because the biggest input is a commodity. What you can do is understand the structure of the number.

Buried liner is a decades-long asset almost anywhere. Exposed liner in a Gulf summer is a much more interesting question, and the answer depends on things…

Most liner leaks are not seam failures. They are punctures made after the seams passed — which is why the testing regime has more than one method in it.

The country is small enough that one stockholding serves all of it, and varied enough that the lining job in Ras Al Khaimah is nothing like the one in Al…
Project enquiry
Send it through. Technical questions get a technical answer, and there is no obligation to buy anything.